HFPME · High Frequency Pressure Monitor & Evaluation

Independent verification for every frac stage.

Naqrah delivers stage-by-stage and cluster-by-cluster fracturing evidence at the wellhead — with no downhole tools, no downhole cables, and zero interruption to the pumping schedule. The operator's single source of truth.

400+
Wells deployed
5,000+
Stages monitored
< 1 h
Wellhead install
0
Downhole tools
1–20 kHz
Sampling rate
175 MPa
Max pressure

Five pillars of operator-side value

Contractor accountability

Objective conformance metrics — design vs. actual fracture geometry, cluster efficiency, SRV — become the basis for KPIs and pay-for-performance clauses.

Independent verification

Fracture results validated by a party with no financial stake in the pumping job. No conflict of interest, no self-reporting bias.

Audit-grade evidence

Defensible, time-stamped documentation for partner audits, JV reporting and regulatory review — not a contractor-edited post-job summary.

Direct operational visibility

Stage-level and cluster-level diagnostics delivered to the asset team in real time — unfiltered and unedited.

Cost discipline

Quantified per-stage SRV and productivity let the operator pay for results rather than activity. Correct underperforming designs before they repeat.

Halfaya Oilfield, Iraq · CNPC flagship overseas asset

A low-permeability sandstone reservoir with 12–15 fracturing stages per well. Deployed since 2024 with verified outcomes across a fleet of pilot wells.

29.2%
IP uplift vs. offset wells
30%
Monitoring cost savings
2.5 → 2.0 h
Fracturing time per stage
0
Screenouts across 168 stages
  • CNPC
  • Sinopec
  • CNOOC
  • Yanchang Petroleum
  • Halfaya Oilfield · Iraq
Next step

Ready to run an independent frac diagnostic on your next pad?

First well pilot at no cost — the operator only provides wellhead access and fracturing cooperation. Preliminary report within 24–72 hours.